frequently asked questions
planning
& approvals
-
Yes, all granny flats require development approval. Malora Homes specialises in CDC (Complying Development Certificate) approval - achieving approval in just 2 weeks with our streamlined process. We handle the entire approval process across Newcastle, Hunter Valley, Lake Macquarie, Central Coast, and Port Stephens.
-
CDC approval is a fast-track system for granny flats meeting specific legislative criteria. It offers:
2-week approval vs months for traditional DA
Greater certainty and lower costs
Streamlined process with less council discretion
Faster project commencement
-
Requirements are tiered based on lot size under NSW legislation:
450m²-900m²: 12m minimum street frontage
900m²-1500m²: 15m minimum street frontage
Over 1500m²: 18m minimum street frontage
Battle-axe lots: 3m wide access, minimum 12m x 12m area
Residential zoning (not rural residential for CDC)
Read more about the NSW State Environmental Planning Policy (Housing) 2021 here.
-
No problem! Properties not meeting CDC criteria can often gain approval through DA (Development Application). Our team has extensive experience with challenging sites including:
Smaller blocks under 450m²
Heritage areas
Environmentally sensitive land
Flood or bushfire prone areas
Properties with complex access
-
Setbacks are legislatively defined by lot size:
Side boundaries:
450m²-900m²: 0.9m minimum
900m²-1500m²: 1.5m minimum
Over 1500m²: 2.5m minimum
Plus 25% of building height above 3.8m
Rear boundaries:
450m²-900m²: 3m minimum (up to 8m for tall buildings)
900m²-1500m²: 5m minimum (up to 12m for tall buildings)
Over 1500m²: 10m minimum (up to 15m for tall buildings)
Protected trees: 3m setback required from all protected trees
Read more about the NSW State Environmental Planning Policy (Housing) 2021 here.
-
Yes, but these require DA approval rather than CDC. We have experience with:
Heritage overlay areas
BAL (Bushfire Attack Level) zones
Flood prone areas
Environmentally sensitive sites While approval takes longer, we can navigate these complex requirements.
design
& construction
-
The secondary dwelling itself is limited to 60m² (unless council allows larger). However, total floor area limits apply to your entire property:
450m²-600m² lots: 330m² total (house + granny flat + attached structures)
600m²-900m² lots: 380m² total
Over 900m² lots: 430m² total
Read more about the NSW State Environmental Planning Policy (Housing) 2021 here.
-
Maximum site coverage varies by lot size:
450m²-900m²: 50% maximum site coverage
900m²-1500m²: 40% maximum site coverage
Over 1500m²: 30% maximum site coverage
-
Malora Homes completes construction in 12 weeks with our efficient building process. Combined with our 2-week CDC approval, total project time is approximately 14 weeks from application to completion.
-
We offer comprehensive solutions:
Internal conversions: Converting part of your existing home (no minimum lot size)
Attached extensions: Adding to your existing house or garage
Detached granny flats: Standalone buildings optimised for your site
Multi-functional designs: Home offices, studios, teenage retreats, investment properties
Split-level configurations: With storage/garage underneath
-
Absolutely! Modern granny flats are incredibly versatile:
Home office or business space for remote work
Teenage retreat or adult children's accommodation
Fitness studio or creative workspace
Investment property for short-term rental (AirBnb)
Multi-generational living solution
Downsizing option while retaining your family home
-
Yes! The 60m² restriction only applies to internal living space. Malora Homes can design:
Covered outdoor entertaining areas
Decks and pergolas
Outdoor kitchens and BBQ areas
Landscaped courtyards
Pool houses and cabanas. This effectively expands your usable space to 90m²+ total.
INVESTMENT
& FINANCIAL
RETURN
-
Granny flats built by Malora Homes typically achieve $450-$550 per week in rental income across our service areas, with potential yields greater than 10% - significantly outperforming traditional property investments.
-
Absolutely! A quality granny flat typically adds more value than the construction cost:
Increased property equity often exceeding investment
Dual income streams from rent and capital growth
Enhanced property functionality and appeal
Future-proofing for changing family needs
-
Granny flats offer multiple financial advantages:
Strong rental yields (10%+ potential)
Increased property equity without buying additional land
Portfolio diversification with lower entry cost
Tax benefits through depreciation and deductions
Growing market demand for affordable rental housing
Hedge against interest rates with additional income
-
Perfect for various family situations:
Elderly parents maintaining independence while staying close
Adult children needing affordable accommodation
Mortgage assistance through additional rental income
Downsizing option without selling your family home
Flexible living arrangements adapting to life changes
Teenage independence while maintaining family connection
Investment Disclaimer: This information is general in nature and does not constitute financial advice. Investment returns are not guaranteed and may vary based on market conditions, location, and individual circumstances. Professional financial advice should be sought before making investment decisions. Case study results are based on specific circumstances and may not be representative of all investment outcomes.
FINANCING
& CONSTRUCTION LOANS
-
Yes! Based on our extensive experience, banks regularly provide preliminary pre-approval based on our preliminary quotes, even before CDC approval. This allows you to move forward with confidence while approvals are processed.
-
Banks offer flexible pathways:
Preliminary pre-approval: Based on our preliminary quote (before CDC)
Full approval: Based on preliminary quote plus executed HIA building contract
Final approval: Based on fixed-price quotation after CDC completion
-
Self-fund the Design & Approval stage if possible. This allows us to provide a final fixed-price quotation based on complete CDC documentation. Banks prefer this approach as it's:
Faster processing with complete documentation
Smoother approval with fixed pricing
Quicker project commencement with all approvals in place
-
With our streamlined process:
Preliminary bank approval: 1-2 weeks
CDC approval: 2 weeks (concurrent with finance)
Construction: 12 weeks
Total timeline: Approximately 14-16 weeks from application to completion
-
We work with several financing partners and can recommend experienced brokers who understand granny flat investments. We can also review investment property contracts to ensure they align with your financing requirements.
technical rfequirements
& compliance
-
No! NSW legislation specifically states no additional parking is required for granny flats. This makes them viable even on smaller blocks where parking might be challenging, though we can discuss practical parking solutions during design.
Read more about the NSW State Environmental Planning Policy (Housing) 2021 here.
-
Minimum landscaped area requirements vary by lot size:
450m²-600m²: 20% minimum landscaped area
600m²-900m²: 25% minimum landscaped area
900m²-1500m²: 35% minimum landscaped area
Over 1500m²: 45% minimum landscaped area
At least 50% of landscaping must be behind the building line from the street.
Read more about the NSW State Environmental Planning Policy (Housing) 2021 here.
-
Every lot must have more than 24m² of principal private open space:
Directly accessible from a habitable room (not bedroom)
More than 4m wide in any direction
Not steeper than 1:50 gradient
Can be shared between main house and granny flat
May include balconies or decks
-
Yes, NSW legislation requires privacy screens for:
Windows in habitable rooms near boundaries under specific height/distance criteria
Balconies/decks within 3m of boundaries (over 1m high) or 3-6m from boundaries (over 2m high)
Privacy screens must be 1.7m-2.2m high. We design these requirements seamlessly into your overall design.
-
All Malora Homes granny flats exceed minimum requirements:
Building Code of Australia compliance
NSW Housing Code standards
Australian Standards for structural integrity
BASIX energy efficiency requirements
Local council specific requirements
Privacy and articulation legislative requirements
SITE SUITABILITY
& CHALLENGING CONDITIONS
-
Absolutely! We specialise in challenging sites. NSW legislation allows specific earthworks:
Excavation: Up to 3m deep (with boundary restrictions)
Fill: Up to 1m high for secondary dwellings
Retaining walls: Engineer-certified for structural soundness
Drainage: Comprehensive stormwater management
Read more about the NSW State Environmental Planning Policy (Housing) 2021 here.
-
All development must maintain a 3m setback from protected trees. However:
Some structures permitted within setback (driveways, pathways, awnings)
Tree removal applications can be managed if necessary
Design solutions to work around significant trees
Arborist reports arranged when required
-
Each council has unique Local Environmental Plans (LEPs). We're intimately familiar with requirements across:
Newcastle and surrounding areas
Hunter Valley regional variations
Lake Macquarie specific controls
Central Coast requirements
Port Stephens local provisions
-
Yes, we manage all utility connections:
Sewer connections up to 10m from existing mains
Water connections up to 10m from existing mains
Electrical connections up to 30m from existing supply
Stormwater drainage to existing systems
NBN and telecommunications provisioning
PROCESS
& SERVICE
-
: Our dedicated consultant guides you through every stage:
Free consultation & site assessment - Feasibility, design concepts, and preliminary advice
Virtual site analysis - Detailed property assessment and positioning advice
Design development - Custom or standard designs tailored to your needs
Comprehensive quotation - Transparent, detailed pricing with no hidden costs
CDC or DA application - 2 weeks for CDC, managed entirely by us
Contract execution - HIA building contract with milestone payments
Construction - 12 weeks with regular progress updates
Quality handover - Comprehensive inspection and documentation
Ongoing support - Warranty service and maintenance advice
-
Our turnkey solution includes:
All design and architectural work
Engineering and structural design
CDC or DA application management
Quality construction with premium inclusions
Project management from start to finish
All necessary utility connections
Compliance with all NSW legislative requirements
Comprehensive warranties
Ongoing support after completion
-
Complete transparency throughout your project:
Dedicated project manager as single point of contact
Regular progress updates and site meetings
Milestone-based invoicing (you only pay for completed work)
Photo progress reports showing construction stages
Direct communication with site supervisors
Quality control inspections at key stages
-
Malora Homes services Newcastle, Hunter Valley, Lake Macquarie, Central Coast, and Port Stephens. As a local, Newcastle-owned business with 20+ years of construction experience, we offer:
Deep knowledge of regional council requirements
Established relationships with local certifiers and suppliers
Understanding of local site conditions and challenges
Responsive service with local presence
Community reputation built over decades
Quality, credentials
& warranties
-
We combine unmatched expertise with superior service:
Speed Advantage:
2-week CDC approval with streamlined process
12-week construction with efficient building methods
14-week total timeline from application to completion
Expertise Advantage:
Complete understanding of NSW Housing SEPP requirements
20+ years residential construction experience
Local knowledge of regional council variations
Legislative compliance ensuring no surprises
Service Advantage:
Dedicated consultant throughout entire process
Premium finishes and attention to detail
Transparent pricing with milestone payments
Comprehensive warranties and ongoing support
Results Advantage:
$450-$550 weekly rental potential
10%+ yields achievable
Award-quality construction with premium finishes
-
Comprehensive protection for your investment:
6-year structural warranty on all structural elements
Comprehensive warranties covering waterproofing and defects
Manufacturer warranties on all appliances and fixtures
90-day maintenance period post-completion
Ongoing support for any issues or questions
Full documentation provided at handover
-
Absolutely. We maintain:
Full building license (BLN: 460606C)
Comprehensive insurance coverage
Public liability and workers compensation
Professional indemnity insurance
Home Building Compensation Fund coverage
-
Contact us today for your free, no-obligation consultation:
Phone: 0414 605 383
Email: info@malorahomes.com.au
Visit: 124 Maitland Road, Mayfield, NSW 2304We'll provide:
Free site assessment and feasibility analysis
Preliminary design concepts tailored to your needs
Transparent quotation with no hidden costs
Clear timeline for your project
Financing guidance and recommendations
frequently
asked
technical questions
-
Yes, subject to height limits (8.5m maximum) and increased setback requirements. Two-storey designs require additional setbacks calculated as 25% of height above 3.8m, but can maximise your 60m² internal space across two levels. This is perfect for:
Bedrooms upstairs with living areas downstairs
Home office with separate living quarters
Enhanced privacy and street presence
Better views from upper level
Read more about the NSW State Environmental Planning Policy (Housing) 2021 here.
-
Yes! There are no restrictions on renting to non-family members. Your granny flat can be:
Long-term rental to tenants
Short-term rental (Airbnb) subject to local council regulations
Commercial use (home office) with appropriate approvals
Mixed use adapting to your changing needs
-
We can manage demolition as part of your project:
Pool removal and site remediation
Shed or garage demolition
Retaining wall removal/modification
Site preparation and levelling
Waste removal and disposal All demolition work is included in our comprehensive service.
-
Yes, we offer both options:
Pre-approved designs for faster processing
Standard plans adaptable to your site
Custom designs tailored to your specific needs
Hybrid approach - standard base with custom modifications This flexibility ensures the perfect solution for your site and budget.
-
We're experienced in challenging environmental conditions:
BAL (Bushfire Attack Level) compliant construction
Flood-resistant design and materials
Cyclone/wind-rated construction for coastal areas
Specialised materials and construction techniques
Additional certifications and approvals managed
-
Absolutely! Our comprehensive service includes:
Contract of sale reviews for investment properties
Financing broker recommendations experienced with granny flats
Investment strategy advice for optimal returns
Rental management referrals for ongoing property management
Tax advice referrals for depreciation and deductions
-
We accommodate reasonable variations:
Minor changes can often be incorporated during construction
Transparent variation pricing with written approval required
Impact assessment on timeline and approvals
Quality assurance maintained throughout any changes All variations are documented and approved before proceeding
-
Yes, comprehensive ongoing support:
90-day maintenance period post-completion
Warranty service for any defects or issues
Annual maintenance recommendations and service
Upgrade advice for future improvements
Ongoing consultation for any questions or concerns
Chat with Malora Homes
about your small home today.
Talk to one our expert team members about your vision and small dwelling needs.
Completely obligation-free.